Configurate your mTUBE plant
Here you can specify where and for what purpose you would like to use mTUBEs with which configuration.
We will contact you as soon as possible for detailed planning.
Requirements at the installation site of the mTUBEs:
Surface:
The subfloor should be level. Slight unevenness of 2% can be compensated by using the support feet.
Manoeuvring space:
Sufficient manoeuvring space must be available around the mTUBEs for incoming/delivering and outgoing vehicles.
Power supply:
Depending on the size of the system, a power supply via CEE socket 400V, 32A (min. 16A) must be ensured on site.